Tilson Live! Ask Us Anything About Building On Your Land - February 24, 2026
Seminar Notes:
- 00:00 Intro Video
- 00:51 Introductions & Welcome
- 03:13 Topic Intro: Ask Us Anything!
- 06:23 Do you need a plat or a boundary survey?
- 08:50 Insulation Options for Climate Zone 3
- 15:39 Does Tilson include the meter loop installation?
- 17:52 Propane Systems vs. Electric Appliances
- 22:27 Water Heater Location Options
- 26:55 Constitution Fireplaces Explained
- 28:18 Installing Generator Transfer Switches
- 29:12 Explanation of Tilson’s Pricing Process
- 32:21 Aerobic vs. Conventional Septic Systems
- 40:11 Garage Placement Options
- 41:42 Are multiple septic systems necessary?
- 45:41 Hybrid Heat Pump Water Heater
- 48:07 Ensuring Positive Drainage & Final Grading
- 54:15 Outsourcing Alternative Tile, Lighting, etc.
- 59:30 Can demolition costs be included in total building costs?
- 1:03:18 Wrap-Up & Goodbyes
Related Articles from Tilson Homes
Have Questions? Ask Us!
Have questions about building a new home with Tilson? We’re here to help you get started and guide you along the way. Fill out the form below and someone will be in touch shortly.